Failed shower pan Cincinnati, OH
WHAT HAPPENED
- Cause of loss
- Water category
- Leak type
- Ceiling assembly
- Framing condition
- Contents at risk
- Insurance support
- Living room (1F)
- Dining area (1F)
- Kitchen (1F)
- Bath (2F) — origin
- Floor 1 total
- Floor 2 bath total
- Total structure
A CLOSER LOOK AT THE DAMAGE
Work completed
Inspection and leak origin confirmed — 2nd floor shower
Initial inspection traced the water migration path from the living room ceiling opening upward to the bathroom directly above. Shower floor tile was removed using an oscillating multi-tool to expose the pan and curb assembly. The failure at the glass panel base seal was confirmed as the origin — with blackened, rotted framing visible at the curb and the surrounding substrate fully compromised.
Living room containment and floor protection
Before any ceiling demo, a full plastic containment barrier was installed floor-to-ceiling across the living room to protect furnishings and limit dust migration. Hardwood floors beneath the work zone were protected with floor covering. All contents near the affected ceiling area were documented and moved to a safe zone.
Ceiling demo — wood lath and plaster removal
The saturated lath and plaster ceiling sections were removed to expose the full joist bay. Wood lath construction retains moisture throughout the assembly and cannot be reliably dried in place — full removal was required to access the framing for drying and to assess structural integrity. The staining pattern on the joists and lath was documented for the insurance scope.
Structural drying — floor assembly
Air movers were positioned to direct airflow through the open ceiling cavity targeting the exposed joist faces and the underside of the bathroom subfloor above. An LGR dehumidifier was deployed in the living room to capture moisture extracted from the assembly. Drying to continue with daily monitoring until all materials reach dry standard.
Shower pan — waterproofing assessment and demo
The shower pan curb, failed tile bed, and compromised backer board were removed to expose the full extent of damage to the floor framing at the shower base. Rotted and blackened framing members were documented and flagged for replacement prior to any shower rebuild. The glass enclosure base seal failure was photographed and documented for the insurance file.
Full documentation and adjuster scope submission
Before-and-after photo documentation produced for all areas — shower pan failure origin, floor cavity condition, living room ceiling opening, and framing staining. Complete scope submitted to the adjuster covering: shower pan demo and waterproofing rebuild, framing repair, lath and plaster ceiling replacement, and structural drying — ensuring the full extent of the chronic leak was captured on the claim.