Sewage Backup Contaminates Cincinnati, OH
WHAT HAPPENED
- Cause of loss
- Water category
- Water class
- Floors affected
- Flooring types affected
- Contents at risk
- Insurance support
- Upstairs bathroom
- 2nd floor hallway
- Main staircase
- 1st floor landing
- 1st floor living area
A CLOSER LOOK AT THE DAMAGE
Work completed
Emergency response — on site within 59 minutes
Crew arrived to find active sewage contamination across the upstairs bathroom, full hallway, staircase, and first-floor landing. Technicians immediately suited up in full Category 3 PPE — Tyvek suits, respirators, gloves — and established containment barriers to prevent further cross-contamination before beginning extraction.
Category 3 extraction — tile, hardwood, and wood stairs
Truck-mounted and portable extractors removed standing and absorbed black water from the bathroom tile floor, second-floor hardwood hallway, all stair treads, and the first-floor landing. Sewage contamination at this category level cannot be dried in place — all saturated porous materials were assessed for removal per IICRC S500 and S520 guidelines.
Antimicrobial treatment and disinfection of all surfaces
Following extraction, all affected surfaces — tile, grout, hardwood, subfloor, baseboard trim, and stair structure — were treated with EPA-registered antimicrobial and biocide agents. The toilet, bathtub, and surrounding fixtures were disinfected. ATP surface testing was conducted to verify pathogen reduction before drying equipment was placed.
Structural drying across all affected floors
LGR dehumidifiers and high-velocity axial air movers were distributed throughout all affected areas — prioritizing subfloor assemblies beneath the bathroom tile, hardwood floor systems in the hallway, and the stair treads. Thermal imaging confirmed moisture migration into wall cavities adjacent to the bathroom and at the base of the staircase. Targeted drying addressed all anomalies.
Daily monitoring and insurance documentation
Moisture readings were logged daily across all monitoring points until all materials returned to acceptable dry standard. A complete moisture mapping report, before-and-after photo documentation by room and surface, and an adjuster-ready scope of work were submitted to the carrier — covering the full multi-floor loss.